Thursday, August 4, 2011

House Update!

So the last time I updated, we had just begun the framing process. Now, we're almost done!!


Second story frame from the front yard. On the left is where the upstairs bath will be, in back are two bedrooms, and to the far right is the loft area.

Taken from the back yard. The far right is the bathroom, in front of that is one bedroom, the second bedroom is on the other side.

Another rear view. You can see the three windows upstairs - from left to right those windows will be: loft, bedroom, bedroom. On the first floor, you can see the second French door opening on the left, then there's the master bath window, and on the right is the master French door.

Cody, Jason and Joel hard at work. Thanks guys!!

This is the opening in the floor of the loft. You will be able to see up there from our entry hall.

Looking into the living room from the entry hall. On the left is one French door opening, and the second French door will go where there is currently a slider (on the far right). And of course, Cash has to be in the middle of all the fun!

The downstairs hallway....powder room is the first door on the left, then the stair entry. The right side of the hallway wall will have the door to enter the master bedroom at the very end.

Matt is in the future stairwell here. This window will be in the landing and will be the "centerpiece" of the exterior of the home.


Stairwell from the inside.

To give some perspective....a picture of the same window, but taken from further back.

So, there you have it. Yesterday, Matt and his Dad built the stairs!!! Yay for no more ladders! Windows are scheduled to arrive early next week, and siding and brick will be going on within the next couple of weeks. At that point, the outside will look like a house again!! Then, it's time to plumb and wire.......

No comments: